Anglo American plc
Anglo American PLC - Anglo American Production Report Q3 2024
24th October 2024, 06:00
TwitterFacebookLinkedIn
To continue viewing RNS, please confirm that you are a Private Investor*

* A Private Investor is a recipient of the information who meets all of the conditions set out below, the recipient:

  1. Obtains access to the information in a personal capacity;
  2. Is not required to be regulated or supervised by a body concerned with the regulation or supervision of investment or financial services;
  3. Is not currently registered or qualified as a professional securities trader or investment adviser with any national or state exchange, regulatory authority, professional association or recognised professional body;
  4. Does not currently act in any capacity as an investment adviser, whether or not they have at some time been qualified to do so;
  5. Uses the information solely in relation to the management of their personal funds and not as a trader to the public or for the investment of corporate funds;
  6. Does not distribute, republish or otherwise provide any information or derived works to any third party in any manner or use or process information or derived works for any commercial purposes.
RNS Number : 3876J
Anglo American PLC
24 October 2024
 

http://www.rns-pdf.londonstockexchange.com/rns/3876J_1-2024-10-23.pdf


24 October 2024

Anglo American plc

Production Report for the third quarter ended 30 September 2024

Duncan Wanblad, Chief Executive of Anglo American, said: "Our consistent focus on operational excellence continues to deliver stable production in line with our expectations. Our Minas-Rio iron ore operation in Brazil achieved a second successive record quarter while the reshaping of our copper operations continues to progress, with the older of the two Los Bronces plants placed on care and maintenance. Ongoing stability at the PGM processing assets allows us to increase full year refined PGM production guidance to 3.7-3.9 million ounces1, and strong operational performance at Nickel increases production guidance to 38,000-39,000 tonnes1, lowering the unit cost guidance to c.530 c/lb1. All other production and unit cost2 guidance is unchanged.

"Our accelerated portfolio simplification to unlock the inherent value in Anglo American is well under way. The PGMs demerger is on track to complete by the middle of 2025. Our Steelmaking Coal sale process continues to see significant competition for this world-class set of assets, with a final round of bidders in place, and we expect to announce execution of a sale agreement in the coming months. We are also encouraged by recent imagery that shows that the fire damage in the underground area of the Grosvenor mine appears limited, further supporting the sale process.

"As previously announced, we reduced rough diamond production from De Beers in response to market conditions. The diamond market remains challenging as the midstream continues to hold higher than normal levels of inventory and the expectation remains for a protracted recovery. As a result and together with our partners, we will continue to assess the options to reduce production going forward.

"We are making excellent progress with our portfolio simplification to create an exciting and differentiated investment proposition focused on our world-class copper, premium iron ore and crop nutrients assets - all future-enabling products. This highly cash generative and much higher margin portfolio will offer greater resilience through cycles with the benefit of significant high quality and well sequenced growth options, including a clear path to increase annual copper production to more than one million tonnes by the early 2030's."

 Q3 2024 highlights

• Copper production is on track to meet full year guidance, decreasing 13% in the quarter as expected versus the comparative period, due to the planned closure of the smaller and more costly Los Bronces plant, partially offset by higher grades at El Soldado. Production at Quellaveco in Peru is expected to increase in the fourth quarter as grades and recoveries improve.

• In Iron Ore, production was 2% higher as Minas-Rio achieved a record third quarter performance, reflecting enhanced operational stability, partially offset by a planned decrease at Kumba to align with third-party logistics constraints. In October, the Brazilian anti-trust regulator approved the Serpentina transaction with Vale, and this is on track to close in the fourth quarter.

Steelmaking coal production decreased by 6%, primarily driven by the cessation of mining at Grosvenor following the underground fire in June 2024. Excluding the impacts of Grosvenor, steelmaking coal production increased by 3%, reflecting higher production from the Dawson open cut operation and Moranbah longwall operation.

• Production from our Platinum Group Metals (PGMs) operations decreased 10% versus the comparative period, primarily reflecting the expected lower metal in concentrate production in line with 2024 guidance. On a quarter-on-quarter basis, production was flat.

Nickel production increased by 6% largely due to operational improvements at Barro Alto.

• Rough diamond production decreased by 25%, reflecting a production response to the prolonged period of lower demand, higher than normal levels of inventory in the midstream and a continued focus on managing working capital.

Production

Q3 2024

Q3 2023

% vs. Q3 2023

YTD 2024

YTD 2023

% vs. YTD 2023

Copper (kt)(3)

181

209

(13)%

575

596

(4)%

Iron ore (Mt)(4)

15.7

15.4

2%

46.5

46.1

1%

Platinum group metals (koz)(5)

922

1,030

(10)%

2,677

2,874

(7)%

Diamonds (Mct)(6)

5.6

7.4

(25)%

18.9

23.9

(21)%

Steelmaking coal (Mt)

4.1

4.4

(6)%

12.1

11.2

8%

Nickel (kt)(7)

9.9

9.3

6%

29.4

28.9

2%

Manganese ore (kt)

406

1,012

(60)%

1,545

2,823

(45)%

(1)     Refined PGM production was previously 3.3-3.7 million ounces. Nickel production was previously 36,000-38,000 tonnes and the unit cost was c.550 c/lb.

(2)     FX rates in 2024 unit cost guidance: c.850 CLP:USD, c.3.7 PEN:USD, c.5.0 BRL:USD, c.19 ZAR:USD, c.1.5 AUD:USD.

(3)     Contained metal basis. Reflects copper production from the Copper operations in Chile and Peru only (excludes copper production from the Platinum Group Metals business).

(4)     Wet basis.

(5)     Produced ounces of metal in concentrate. 5E + gold (platinum, palladium, rhodium, ruthenium and iridium plus gold). Reflects own mined production and purchase of concentrate.

(6)     Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis.

(7)     Reflects nickel production from the Nickel operations in Brazil only (excludes 7.4 kt of Q3 2024 nickel production from the Platinum Group Metals business).

Production and unit cost guidance summary

 

2024 production guidance

2024 unit cost guidance(1)

Copper(2)

730-790 kt

c.157 c/lb

Iron Ore(3)

58-62 Mt

c.$37/t

Platinum Group Metals(4)

3.3-3.7 Moz

c.$920/oz

Diamonds(5)

23-26 Mct

c.$95/ct

Steelmaking Coal(6)

14-15.5 Mt

c.$130-140/t

Nickel(7)

38-39 kt

c.530 c/lb

(previously 36-38 kt)

(previously c.550 c/lb)

(1)     Unit costs exclude royalties and depreciation and include direct support costs only. 2024 unit cost guidance was set at: c.850 CLP:USD, c.3.7 PEN:USD, c.5.0 BRL:USD, c.19 ZAR:USD, c.1.5 AUD:USD.

(2)     Copper business only. On a contained-metal basis. Total copper production is the sum of Chile and Peru: Chile: 430-460 kt and Peru: 300-330 kt. 2024 unit cost guidance for Chile: c.190 c/lb and Peru: c.110 c/lb. The copper unit costs are impacted by FX rates and pricing of by-products, such as molybdenum. Production in Chile is weighted to the first half of the year due to the planned closure of the Los Bronces plant at the end of July; production is also subject to water availability. Production in Peru is weighted to the second half of the year as a higher grade area of the mine is accessed.

(3)     Wet basis. Total iron ore is the sum of operations at Kumba in South Africa and Minas-Rio in Brazil. Kumba: 35-37 Mt and Minas-Rio: 23-25 Mt. Kumba production is subject to third-party rail and port availability and performance. 2024 unit cost guidance for Kumba: c.$38/t and Minas-Rio: c.$35/t.

(4)     5E + gold produced metal in concentrate (M&C) ounces. Includes own mined production and purchased concentrate (POC) volumes. M&C production by source is expected to be own mined of 2.1-2.3 million ounces and purchase of concentrate of 1.2-1.4 million ounces. The average M&C split by metal is Platinum: c.45%, Palladium: c.35% and Other: c.20%. Refined production (5E + gold) is revised up to 3.7-3.9 million ounces (previously 3.3-3.7 million ounces) reflecting the benefit of no Eskom load-curtailment this year and good stability at the processing assets which has enabled a release of built-up work-in-progress inventory. Production remains subject to the impact of Eskom load-curtailment. Unit cost is per own mined 5E + gold PGMs metal in concentrate ounce.

(5)     Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis. As the midstream continues to hold higher than normal levels of inventory and the expectation for a recovery remains protracted, De Beers is actively assessing options with our partners to reduce production going forward. Unit cost is based on De Beers' share of production.

(6)     Production excludes thermal coal by-product. FOB unit cost comprises managed operations and excludes royalties. A planned longwall move at Moranbah is taking place during Q4 2024. A walk-on/walk-off longwall move at Aquila, that will have a minimal production impact, started initial commissioning in late Q3 and will occur during mid-Q4 2024.

(7)     Nickel operations in Brazil only. The Group also produces approximately 20 kt of nickel on an annual basis from the PGM operations. Nickel production has been revised up reflecting strong operational performance and consequently, unit costs have been revised down.

Realised prices

 

Q3 YTD 2024

Q3 YTD 2023

Q3 YTD 2024 vs.

Q3 YTD 2023

Copper (USc/lb)(1)

421

387

9%

Copper Chile (USc/lb)(2)

426

388

10%

Copper Peru (USc/lb)

414

386

7%

Iron Ore - FOB prices(3)

90

108

(17)%

Kumba Export (US$/wmt)(4)

94

110

(15)%

Minas-Rio (US$/wmt)(5)

85

106

(20)%

Platinum Group Metals

 

 

 

Platinum (US$/oz)(6)

959

981

(2)%

Palladium (US$/oz)(6)

1,013

1,437

(30)%

Rhodium (US$/oz)(6)

4,649

7,366

(37)%

Basket price (US$/PGM oz)(7)

1,455

1,766

(18)%

Diamonds

 

 

 

Consolidated average realised price (US$/ct)(8)

160

154

4%

Average price index(9)

109

133

(18)%

Steelmaking Coal - HCC (US$/t)(10)

253

264

(4)%

Steelmaking Coal - PCI (US$/t)(10)

187

215

(13)%

Nickel (US$/lb)(11)

6.93

8.29

(16)%

(1)     Average realised total copper price is a weighted average of the Copper Chile and Copper Peru realised prices.

(2)     Realised price for Copper Chile excludes third-party sales volumes.

(3)     Average realised total iron ore price is a weighted average of the Kumba and Minas-Rio realised prices.

(4)     Average realised export basket price (FOB Saldanha) (wet basis as product is shipped with ~1.6% moisture). The realised prices could differ to Kumba's stand-alone results due to sales to other Group companies. Average realised export basket price (FOB Saldanha) on a dry basis is $96/t (Q3 YTD 2023: $112/t), higher than the dry 62% Fe benchmark price of $92/t (FOB South Africa, adjusted for freight).

(5)     Average realised export basket price (FOB Açu) (wet basis as product is shipped with ~9% moisture).

(6)     Realised price excludes trading.

(7)     Price for a basket of goods per PGM oz. The dollar basket price is the net sales revenue from all metals sold (PGMs, base metals and other metals) excluding trading, per PGM 5E + gold ounces sold (own mined and purchased concentrate) excluding trading.

(8)     Consolidated average realised price based on 100% selling value post-aggregation.

(9)     Average of the De Beers price index for the Sights within the period. The De Beers price index is relative to 100 as at December 2006.

(10)   Weighted average coal sales price achieved at managed operations. The average realised price for thermal coal by-product for Q3 YTD 2024, decreased by 24% to $118/t (Q3 YTD 2023: $156/t).

(11)   Nickel realised price reflects the market discount for ferronickel (the product produced by the Nickel business).


Copper

Copper(1) (tonnes)

Q3

Q3

Q3 2024 vs. Q3 2023

Q2

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2023

2024

2024

2023

Copper

181,300

209,100

(13)%

195,700

(7)%

575,100

596,300

(4)%

Copper Chile

112,600

121,600

(7)%

120,400

(6)%

359,100

371,000

(3)%

Copper Peru

68,700

87,500

(21)%

75,300

(9)%

216,000

225,300

(4)%

(1)     Copper production shown on a contained metal basis. Reflects copper production from the Copper operations in Chile and Peru only (excludes copper production from the Platinum Group Metals business).

 

Group copper production continues to track to guidance in both Chile and Peru, with the operations progressing on the reset mine plans implemented at the end of 2023. Total production of 181,300 tonnes reflects the reconfiguration of the Los Bronces mine and  lower grades and recoveries  at Quellaveco.

Chile - Copper production was primarily impacted by the planned closure of the Los Bronces plant, which has been put on care and maintenance, resulting in a 7% decrease to 112,600 tonnes.

At Collahuasi, Anglo American's attributable share of copper production was broadly flat at 64,700 tonnes, as higher grades and throughput were offset by lower recoveries. As the mine transitions between different phases, the processing of lower grade stockpiles is expected to continue into 2025.

Production from Los Bronces decreased by 20% to 36,600 tonnes, due to placing the smaller and more costly Los Bronces plant (c.40% of total plant capacity) on care and maintenance, as planned and previously reported, at the end of July. The ongoing characteristics of lower grade and ore hardness as a result of the current mine phase will continue to impact operations until the next phase of the mine, where grades are expected to be higher and the ore softer. As previously disclosed, development work for this phase is under way and is expected to benefit production from early 2027.

Production from El Soldado increased by 16% to 11,300 tonnes, reflecting planned higher grades (0.95% vs 0.60%), partially offset by lower throughput, which was in part due to an unplanned stoppage at the plant.

The year to date average realised price of 426 c/lb includes 56,400 tonnes of copper provisionally priced as at 30 September 2024 at an average of 443 c/lb.

Peru - Quellaveco production was 68,700 tonnes, down on the comparative period, owing to lower recoveries and grades as the mine moves through a lower grade area (0.70% vs. 0.93%), partially offset by record throughput in the quarter. Grades are expected to increase in the fourth quarter as previously planned. Recoveries are also expected to increase sequentially as improvements continue to optimise the coarse particle recovery plant.

The year to date average realised price of 414 c/lb includes 53,000 tonnes of copper provisionally priced as at 30 September 2024 at an average of 427 c/lb.

2024 Guidance

Production guidance for 2024 is unchanged at 730,000-790,000 tonnes (Chile 430,000-460,000 tonnes; Peru 300,000-330,000 tonnes). Production in Chile is weighted to the first half of the year due to the planned closure of the Los Bronces plant at the end of July; production is also subject to water availability. Production in Peru is weighted to the second half of the year as a higher grade area of the mine is accessed.

Unit cost guidance for 2024 is unchanged at c.157 c/lb(1) (Chile c.190 c/lb(1); Peru c.110 c/lb(1)), although the weaker Chilean peso has provided a tailwind year-to-date.

(1)     The copper unit costs are impacted by FX rates and pricing of by-products, such as molybdenum. 2024 unit cost guidance was set at c.850 CLP:USD for Chile and c.3.7 PEN:USD for Peru.

  

 

 



 

Copper(1) (tonnes)

Q3

Q2

Q1

Q4

Q3

Q3 2024 vs. Q3 2023

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2024

2024

2023

2023

2024

2023

Total copper production

181,300

195,700

198,100

229,900

209,100

(13)%

(7)%

575,100

596,300

(4)%

Total copper sales volumes

173,200

213,600

177,300

242,600

211,700

(18)%

(19)%

564,100

600,700

(6)%

 

 

 

 

 

 

 

 

 

 

 

Copper Chile

 

 

 

 

 

 

 

 

 

 

Los Bronces mine(2)

 

 

 

 

 

 

 

 

 

 

Ore mined

9,462,100

12,688,000

11,974,700

13,365,200

11,209,200

(16)%

(25)%

34,124,800

37,065,100

(8)%

Ore processed - Sulphide

7,944,900

10,566,600

10,330,300

11,562,800

9,695,800

(18)%

(25)%

28,841,800

32,201,000

(10)%

Ore grade processed -

Sulphide (% TCu)(3)

0.44

0.48

0.47

0.52

0.49

(10)%

(8)%

0.47

0.51

(8)%

Production - Copper in concentrate

30,200

40,900

40,300

49,400

38,600

(22)%

(26)%

111,400

135,400

(18)%

Production - Copper cathode

6,400

7,500

8,400

7,800

7,200

(11)%

(15)%

22,300

22,900

(3)%

Total production

36,600

48,400

48,700

57,200

45,800

(20)%

(24)%

133,700

158,300

(16)%

Collahuasi 100% basis

(Anglo American share 44%)

 

 

 

 

 

 

 

 

 

 

Ore mined

12,803,800

10,336,300

10,472,200

15,892,300

15,949,200

(20)%

24%

33,612,300

44,685,200

(25)%

Ore processed - Sulphide

14,975,700

15,781,200

14,350,000

14,943,300

14,502,000

3%

(5)%

45,106,900

42,408,500

6%

Ore grade processed -

Sulphide (% TCu)(3)

1.20

1.08

1.20

1.33

1.19

1%

11%

1.16

1.11

5%

Anglo American's 44% share of copper production for Collahuasi

64,700

60,300

64,700

71,700

66,100

(2)%

7%

189,700

180,500

5%

El Soldado mine(2)

 

 

 

 

 

 

 

 

 

 

Ore mined

2,255,700

1,805,600

1,857,400

2,190,000

633,000

256%

25%

5,918,700

5,466,200

8%

Ore processed - Sulphide

1,505,800

1,568,700

1,712,600

1,526,300

2,026,800

(26)%

(4)%

4,787,100

5,273,200

(9)%

Ore grade processed -

Sulphide (% TCu)(3)

0.95

0.94

0.94

0.62

0.60

58%

1%

0.94

0.75

25%

Production - Copper in concentrate

11,300

11,700

12,700

7,300

9,700

16%

(3)%

35,700

32,200

11%

Chagres smelter(2)

 

 

 

 

 

 

 

 

 

 

Ore smelted(4)

24,400

26,100

27,000

28,100

28,600

(15)%

(7)%

77,500

85,400

(9)%

Production

23,300

25,400

25,600

27,400

27,700

(16)%

(8)%

74,300

82,700

(10)%

Total copper production(5)

112,600

120,400

126,100

136,200

121,600

(7)%

(6)%

359,100

371,000

(3)%

Total payable copper production

108,000

115,700

121,300

131,000

117,000

(8)%

(7)%

345,000

356,600

(3)%

Total copper sales volumes

107,800

132,900

109,400

146,900

120,300

(10)%

(19)%

350,100

357,900

(2)%

Total payable sales volumes

103,400

127,600

105,200

140,000

115,600

(11)%

(19)%

336,200

345,000

(3)%

Third-party sales(6)

123,500

87,600

80,300

139,300

126,600

(2)%

41%

291,400

304,400

(4)%

 

 

 

 

 

 

 

 

 

 

 

Copper Peru

 

 

 

 

 

 

 

 

 

 

Quellaveco mine(7)

 

 

 

 

 

 

 

 

 

 

Ore mined

8,730,500

9,486,400

11,025,800

13,368,500

9,900,400

(12)%

(8)%

29,242,700

28,678,500

2%

Ore processed - Sulphide

12,431,300

12,397,000

12,206,700

11,821,300

11,240,600

11%

0%

37,035,000

27,943,600

33%

Ore grade processed -

Sulphide (% TCu)(3)

0.70

0.74

0.72

0.95

0.93

(25)%

(5)%

0.72

0.97

(26)%

Total copper production

68,700

75,300

72,000

93,700

87,500

(21)%

(9)%

216,000

225,300

(4)%

Total payable copper production

66,400

72,800

69,600

90,600

84,600

(22)%

(9)%

208,800

217,800

(4)%

Total copper sales volumes

65,400

80,700

67,900

95,700

91,400

(28)%

(19)%

214,000

242,800

(12)%

Total payable sales volumes

62,900

77,700

65,500

92,500

88,300

(29)%

(19)%

206,100

234,500

(12)%

(1)     Excludes copper production from the Platinum Group Metals business.

(2)     Anglo American ownership interest of Los Bronces, El Soldado and the Chagres smelter is 50.1%. Production is stated at 100% as Anglo American consolidates these operations.

(3)     TCu = total copper.

(4)     Copper contained basis. Includes third-party concentrate.

(5)     Total copper production includes Anglo American's 44% interest in Collahuasi.

(6)     Relates to sales of copper not produced by Anglo American operations.

(7)     Anglo American ownership interest of Quellaveco is 60%. Production is stated at 100% as Anglo American consolidates this operation.

 

 

 

Iron Ore

Iron Ore (000 t)

Q3

Q3

Q3 2024 vs. Q3 2023

Q2

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2023

2024

2024

2023

Iron Ore

15,746

15,397

2%

15,580

1%

46,469

46,120

1%

Kumba(1)

9,446

9,736

(3)%

9,184

3%

27,905

28,481

(2)%

Minas-Rio(2)

6,300

5,661

11%

6,396

(2)%

18,564

17,639

5%

(1)     Volumes are reported as wet metric tonnes. Product is shipped with ~1.6% moisture.

(2)     Volumes are reported as wet metric tonnes. Product is shipped with ~9% moisture.

 

Group iron ore production was 15.7 million tonnes, as Minas-Rio achieved a record third quarter performance and Kumba achieved its highest production over the last 12 months.

Kumba - Total production was 9.4 million tonnes, down 3%, which reflects the reconfiguration to align production to third-party logistics performance. On a quarter-on-quarter basis, production was up 3%, reflecting operational stability.

Total sales were broadly flat 8.8 million tonnes(1), as inclement weather conditions impacted the port in July; however, the third-party rail and port performance has continued to constrain sales. The Transnet annual shutdown for rail and port maintenance that began in early October has been completed.

Total finished stock was 8.6 million tonnes(1), with stock at the mines at 7.5 million tonnes(1) and stock at the port of 1.1 million tonnes(1). Additional investment in the ultra-high-dense-media-separation (UHDMS) project at Sishen was announced by Kumba in August 2024 and over the next few years, mine stock levels will remain elevated to assist with the tie-in of the UHDMS modules.

Kumba's iron (Fe) content averaged 64.1% (YTD 2023: 63.5%), while the average lump:fines ratio was 64:36 (YTD 2023: 66:34).

The year to date average realised price of $94/tonne(1) (FOB South Africa, wet basis) was 4% higher than the 62% Fe benchmark price of $90/tonne(1) (FOB South Africa, adjusted for freight and moisture). The premiums for higher iron content and lump product were partially offset by the impact of provisionally priced sales volumes.

Minas-Rio - Production increased 11% to 6.3 million tonnes, reflecting a record third quarter performance due to actions taken to secure the volume and quality of the ore feed, combined with operational improvements at the beneficiation plant leading to higher mass recovery.

The year to date average realised price of $85/tonne (FOB Brazil, wet basis) was 3% lower than the Metal Bulletin 65 price of $88/tonne (FOB Brazil, adjusted for freight and moisture), impacted by provisionally priced sales volumes which more than offset the premium for our high quality product, including higher (~67%) Fe content.

2024 Guidance

Production guidance for 2024 is unchanged at 58-62 million tonnes (Kumba 35-37 million tonnes; Minas-Rio 23-25 million tonnes). Kumba is subject to third-party rail and port availability and performance.

Unit cost guidance for 2024 is unchanged at c.$37/tonne(2) (Kumba c.$38/tonne(2); Minas-Rio c.$35/tonne(2)).

(1)     Production and sales volumes, stock and realised price are reported on a wet basis and could differ to Kumba's stand-alone results due to sales to other Group companies. At Q3 2023, total finished stock was 9.0 million tonnes; stock at the mines was 7.2 million tonnes and stock at the port was 1.8 million tonnes. At H1 2024, total finished stock was 8.2 million tonnes; stock at the mines was 7.4 million tonnes and stock at the port was 0.8 million tonnes.

 

(2)     2024 unit cost guidance was set at c.19 ZAR:USD for Kumba and c.5.0 BRL:USD for Minas-Rio.

Iron Ore (000 t)

Q3

Q2

Q1

Q4

Q3

Q3 2024 vs. Q3 2023

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2024

2024

2023

2023

2024

2023

Iron Ore production(1)

15,746

15,580

15,143

13,806

15,397

2%

1%

46,469

46,120

1%

Iron Ore sales(1)

15,181

16,508

12,997

16,413

14,748

3%

(8)%

44,686

45,075

(1)%

 

 

 

 

 

 

 

 

 

 

 

Kumba production

9,446

9,184

9,275

7,234

9,736

(3)%

3%

27,905

28,481

(2)%

Sishen

6,767

6,644

6,563

5,958

6,680

1%

2%

19,974

19,463

3%

Kolomela

2,679

2,540

2,712

1,276

3,056

(12)%

5%

7,931

9,018

(12)%

Kumba sales volumes(2)

8,822

9,705

8,383

9,344

8,873

(1)%

(9)%

26,910

27,828

(3)%

Lump(2)

5,734

5,981

5,520

6,221

5,878

(2)%

(4)%

17,235

18,485

(7)%

Fines(2)

3,088

3,724

2,863

3,123

2,995

3%

(17)%

9,675

9,343

4%

 

 

 

 

 

 

 

 

 

 

 

Minas-Rio production

 

 

 

 

 

 

 

 

 

 

Pellet feed

6,300

6,396

5,868

6,572

5,661

11%

(2)%

18,564

17,639

5%

Minas-Rio sales volumes

 

 

 

 

 

 

 

 

 

 

Export - pellet feed

6,359

6,803

4,614

7,069

5,875

8%

(7)%

17,776

17,247

3%

(1)     Total iron ore is the sum of Kumba and Minas-Rio and reported in wet metric tonnes. Kumba product is shipped with ~1.6% moisture and Minas-Rio product is shipped with ~9% moisture.

(2)     Sales volumes could differ to Kumba's stand-alone results due to sales to other Group companies.

Platinum Group Metals (PGMs)

PGMs (000 oz)(1)

Q3

Q3

Q3 2024 vs. Q3 2023

Q2

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2023

2024

2024

2023

Metal in concentrate production

922

1,030

(10)%

921

0%

2,677

2,874

(7)%

Own mined(2)

552

666

(17)%

547

1%

1,604

1,865

(14)%

Purchase of concentrate (POC)(3)

370

364

2%

374

(1)%

1,074

1,009

6%

Refined production(4)

1,107

910

22%

1,154

(4)%

2,888

2,610

11%

(1)     Ounces refer to troy ounces. PGMs consists of 5E + gold (platinum, palladium, rhodium, ruthenium and iridium plus gold).

(2)     Includes managed operations and 50% of joint operation production.

(3)     Includes the other 50% of joint operation production, as well as the purchase of concentrate from third parties.

(4)     Refined production excludes toll refined material.

Metal in concentrate production

Own mined production decreased by 17% to 552,000 ounces, mainly due to the disposal of Kroondal in Q4 2023(1). Excluding Kroondal, production decreased by 9% due to lower production from Mogalakwena and Amandelbult, partially offset by higher production from Unki. On a quarter-on-quarter basis, own mined production was broadly flat, reflecting stability from the turnaround initiatives.

As flagged in the half year results, Mogalakwena's production of 217,800 ounces was impacted in July by downtime and repairs caused by an electrical failure in the North Concentrator's primary mill (c.45,000 ounces). The mill has returned to normal operating levels as at the end of July. This impact was partially offset in the period by improved performance at the South Concentrator. 

In response to the double fatality that occurred at Amandelbult in June, production decreased by 14% to 158,200 ounces due to operational safety stoppages in July aimed at resetting safety performance, which negatively impacted production by c.20,000 ounces.

Purchase of concentrate increased by 2% to 370,300 ounces, reflecting the transition of Kroondal to a 100% third-party purchase of concentrate arrangement from November 2023. Normalising the comparative period to include 100% of Kroondal results in a 12% decrease, reflecting lower third-party receipts. In addition, on 1 September 2024, Kroondal transitioned from a 100% purchase of concentrate agreement to a 4E tolling arrangement, as outlined in the Kroondal sales announcement.

Refined production

Refined production increased by 22% to 1,106,900 ounces as a result of the impact of unplanned municipal water stoppages at the processing operations in the comparative period, as well as a draw down of work-in-progress inventory during the quarter. There was no Eskom load-curtailment on the operations.

Sales

Sales volumes increased by 16% to 1,102,200 ounces, supported by higher refined production compared to the same period of last year.

The year to date average realised basket price of $1,455/PGM ounce was 18% lower, mainly due to a 37% decrease in rhodium prices and a 30% decrease in palladium prices.

2024 Guidance

Production guidance for 2024 for metal in concentrate(2) is unchanged at 3.3-3.7 million ounces. However, refined production is revised up to 3.7-3.9 million ounces (previously 3.3-3.7 million ounces), reflecting the benefit of no Eskom load-curtailment this year and good stability at the processing assets which has enabled a release of built-up work-in-progress inventory. Production remains subject to the impact of Eskom load-curtailment.

Unit cost guidance for 2024 is unchanged at c.$920/PGM ounce(3).


(1)     The disposal of our 50% interest in Kroondal was completed and effective on 1 November 2023, this resulted in Kroondal moving to a 100% third-party purchase of concentrate arrangement until it transferred to a toll arrangement. As expected, from 1 September 2024, Kroondal transitioned to a 4E toll arrangement on the same terms as other Sibanye-Stillwater tolled volumes.

(2)     Metal in concentrate (M&C) production by source is expected to be own mined of 2.1-2.3 million ounces and purchase of concentrate of 1.2-1.4 million ounces. The average M&C split by metal is Platinum: c.45%, Palladium: c.35% and Other: c.20%.


(3)     Unit cost is per own mined 5E + gold PGMs metal in concentrate ounce. 2024 unit cost guidance was set at c.19 ZAR:USD.

 

Q3

Q2

Q1

Q4

Q3

Q3 2024 vs. Q3 2023

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

 

2024

2024

2024

2023

2023

2024

2023

M&C PGMs production (000 oz)(1)

922.3

921.0

834.1

932.2

1,029.6

(10)%

0%

2,677.4

2,873.9

(7)%

Own mined

552.0

547.2

504.3

595.7

665.8

(17)%

1%

1,603.5

1,864.5

(14)%

Mogalakwena

217.8

232.6

219.5

265.3

246.8

(12)%

(6)%

669.9

708.2

(5)%

Amandelbult

158.2

157.6

127.1

149.9

184.9

(14)%

0%

442.9

484.3

(9)%

Mototolo

74.1

66.3

61.9

66.5

76.1

(3)%

12%

202.3

222.2

(9)%

Unki

62.2

54.7

62.8

61.8

60.5

3%

14%

179.7

182.0

(1)%

Modikwa - joint operation(2)

39.7

36.0

33.0

36.3

39.6

0%

10%

108.7

109.1

0%

Kroondal - joint operation(3)

-

-

-

15.9

57.9

n/a

n/a

-

158.7

n/a

Purchase of concentrate

370.3

373.8

329.8

336.5

363.8

2%

(1)%

1,073.9

1,009.4

6%

Modikwa - joint operation(2)

39.7

36.0

33.0

36.3

39.6

0%

10%

108.7

109.1

0%

Kroondal - joint operation(3)

-

-

-

15.9

57.9

n/a

n/a

-

158.7

n/a

Third parties(3)

330.6

337.8

296.8

284.3

266.3

24%

(2)%

965.2

741.6

30%

 

 

 

 

 

 

 

 

 

 

 

Refined PGMs production (000 oz)(1)(4)

1,106.9

1,153.5

628.0

1,191.1

909.7

22%

(4)%

2,888.4

2,609.5

11%

By metal:

 

 

 

 

 

 

 

 

 

 

Platinum

536.9

554.0

272.7

565.2

428.5

25%

(3)%

1,363.6

1,183.9

15%

Palladium

341.7

372.5

206.4

400.0

285.5

20%

(8)%

920.6

868.6

6%

Rhodium

70.2

70.8

39.6

61.3

57.1

23%

(1)%

180.6

164.3

10%

Other PGMs and gold

158.1

156.2

109.3

164.6

138.6

14%

1%

423.6

392.7

8%

Nickel (tonnes)

7,400

7,300

4,700

7,000

5,400

37%

1%

19,400

14,800

31%

Tolled material (000 oz)(5)

153.8

132.9

160.2

175.1

159.8

(4)%

16%

446.9

445.5

0%

PGMs sales from production (000 oz)(1)

1,102.2

1,266.1

707.5

1,166.2

951.8

16%

(13)%

3,075.8

2,759.1

11%

Third-party PGMs sales (000 oz)(1)(6)

1,973.7

2,092.4

1,200.1

1,050.3

1,220.9

62%

(6)%

5,266.2

3,286.1

60%

4E head grade (g/t milled)(7)

3.22

3.17

3.05

3.35

3.29

(2)%

2%

3.15

3.18

(1)%

(1)     M&C refers to metal in concentrate. Ounces refer to troy ounces. PGMs consists of 5E + gold (platinum, palladium, rhodium, ruthenium and iridium plus gold).

(2)     Modikwa is a 50% joint operation. The 50% equity share of production is presented under 'Own mined' production. Anglo American Platinum purchases the remaining 50% of production, which is presented under 'Purchase of concentrate'.

(3)     Kroondal was a 50% joint operation until 1 November 2023. Up until this date, the 50% equity share of production was presented under 'Own mined' production and the remaining 50% of production, that Anglo American Platinum purchased, was presented under 'Purchase of concentrate'. Upon the disposal of our 50% interest, Kroondal transitioned to a 100% third-party purchase of concentrate arrangement, whereby 100% of production is presented under 'Purchase of concentrate: Third parties' until it transitioned to a toll arrangement. As expected, from 1 September 2024, Kroondal transitioned to a 4E toll arrangement on the same terms as other Sibanye-Stillwater tolled volumes.

(4)     Refined production excludes toll material.

(5)     Tolled volume measured as the combined content of: platinum, palladium, rhodium and gold, reflecting the tolling agreements in place.

(6)     Relates to sales of metal not produced by Anglo American operations, and includes metal lending and borrowing activity.

(7)     4E: the grade measured as the combined content of: platinum, palladium, rhodium and gold, excludes tolled material. Minor metals are excluded due to variability.


De Beers - Diamonds

Diamonds(1) (000 carats)

Q3

Q3

Q3 2024 vs. Q3 2023

Q2

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2023

2024

2024

2023

Botswana

3,994

5,837

(32)%

4,710

(15)%

13,691

18,565

(26)%

Namibia

456

530

(14)%

561

(19)%

1,650

1,761

(6)%

South Africa

513

365

41%

505

2%

1,616

1,570

3%

Canada

603

676

(11)%

673

(10)%

1,921

2,032

(5)%

Total carats recovered

5,566

7,408

(25)%

6,449

(14)%

18,878

23,928

(21)%

(1)     Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis.

Operational Performance

Rough diamond production decreased by 25% to 5.6 million carats, reflecting a production response to the prolonged period of lower demand, higher than normal levels of inventory in the midstream and a continued focus on managing working capital.

In Botswana, production decreased by 32% to 4.0 million carats, as actions to lower production at Jwaneng were delivered.

Production in Namibia decreased by 14% to 0.5 million carats, reflecting intentional action to lower production at Debmarine Namibia, partially offset by planned higher grade mining and better recoveries at Namdeb.

In South Africa, production increased by 41% to 0.5 million carats, as Venetia underground ramps up.

Production in Canada decreased by 11% to 0.6 million carats due to the planned treatment of lower grade ore.

Trading Performance

Trading conditions during the quarter continued to be challenging in light of higher than normal midstream inventory levels and the prolonged period of depressed consumer demand in China. In response, Sights 7 and 8 were merged into a single selling event. In addition, in Q4, the dates for Sights 9 and 10 were brought forward, all with a focus on supporting Sightholders in navigating midstream trading conditions as they head towards the end-of-year retail selling season.

Rough diamond sales in the combined Sight 7 and 8 will be reflected in the Q4 production report, as sales from the event continued beyond the end of the third quarter. Consequently, rough diamond sales in Q3 2024 totalled 2.1 million carats(1) from one Sight, generating $213m in revenue, compared with 7.4 million carats(1) from three Sights in Q3 2023, generating $899m in revenue, and 7.8 million carats(1) from three Sights in Q2 2024, generating $1,039m in revenue.

The year to date consolidated average realised price increased by 4% to $160/ct, reflecting a larger proportion of higher value rough diamonds being sold, partially offset by an 18% decrease in the average rough price index. In Q3, the average rough price index was largely flat compared to Q2 2024.

De Beers Jewellers delivered consistent performance with growth in design-led pieces, while bridal and solitaire demand remained challenged by macro-economic headwinds and slower Chinese recovery. Forevermark's global operations ramped down, consistent with the strategy to focus the brand on India.

New natural diamond marketing collaborations were established with world-leading diamond jewellery retailers: Signet in the US and Chow Tai Fook in China, with further opportunities planned. The collaborations focus on driving long term desirability for natural diamonds in two of the world's leading consumer countries for natural diamonds. The collaborations will also benefit from promotional messages being amplified through the wide reach of these leading retail businesses.

De Beers also announced the introduction of DiamondProof™, a new device to be used on the jewellery retail counter for rapidly distinguishing between natural diamonds and lab-grown diamonds, supporting retailers in communicating the attributes of natural diamonds, providing customers with enhanced confidence in the authenticity of their natural diamond purchase and deterring undisclosed lab-grown diamonds from entering the natural supply chain.

2024 Guidance

Production guidance(2) for 2024 is unchanged at 23-26 million carats; however, as the midstream continues to hold higher than normal levels of inventory and the expectation for a recovery remains protracted, De Beers is actively assessing options with our partners to reduce production going forward.

Unit cost guidance for 2024 is unchanged at c.$95/carat(3).

(1)     On a consolidated basis, sales volumes in Q3 2024 were 1.7 million carats, Q3 2023 were 6.7 million carats and Q2 2024 were 7.3 million carats. Consolidated sales volumes exclude De Beers Group's JV partners' 50% proportionate share of sales to entities outside De Beers Group from the Diamond Trading Company Botswana and the Namibia Diamond Trading Company, which are included in total sales volume (100% basis).

(2)     Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis.

 

(3)     Unit cost is based on De Beers' share of production. 2024 unit cost guidance was set at c.19 ZAR:USD.

Diamonds(1)

Q3

Q2

Q1

Q4

Q3

Q3 2024 vs. Q3 2023

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2024

2024

2023

2023

2024

2023

Carats recovered (000 carats)

 

 

 

 

 

 

 

 

 

 

100% basis (unless stated)

 

 

 

 

 

 

 

 

 

 

Jwaneng

1,402

1,881

2,494

3,192

3,400

(59)%

(25)%

5,777

10,137

(43)%

Orapa(2)

2,592

2,829

2,493

2,943

2,437

6%

(8)%

7,914

8,428

(6)%

Total Botswana

3,994

4,710

4,987

6,135

5,837

(32)%

(15)%

13,691

18,565

(26)%

 

 

 

 

 

 

 

 

 

 

 

Debmarine Namibia

298

427

505

435

423

(30)%

(30)%

1,230

1,424

(14)%

Namdeb (land operations)

158

134

128

131

107

48%

18%

420

337

25%

Total Namibia

456

561

633

566

530

(14)%

(19)%

1,650

1,761

(6)%

 

 

 

 

 

 

 

 

 

 

 

Venetia

513

505

598

434

365

41%

2%

1,616

1,570

3%

Total South Africa

513

505

598

434

365

41%

2%

1,616

1,570

3%

 

 

 

 

 

 

 

 

 

 

 

Gahcho Kué (51% basis)

603

673

645

802

676

(11)%

(10)%

1,921

2,032

(5)%

Total Canada

603

673

645

802

676

(11)%

(10)%

1,921

2,032

(5)%

Total carats recovered

5,566

6,449

6,863

7,937

7,408

(25)%

(14)%

18,878

23,928

(21)%

 

 

 

 

 

 

 

 

 

 

 

Total sales volume (100%) (000 carats)(3)

2,077

7,819

4,869

2,753

7,350

(72)%

(73)%

14,765

24,605

(40)%

Consolidated sales volume (000 carats)(3)

1,665

7,333

4,612

2,637

6,742

(75)%

(77)%

13,610

22,045

(38)%

Consolidated sales value ($m)(4)

213

1,039

925

230

899

(76)%

(79)%

2,177

3,398

(36)%

Average price ($/ct)(5)

128

142

201

87

133

(4)%

(10)%

160

154

4%

Average price index(6)

107

108

110

125

125

(14)%

(1)%

109

133

(18)%

Number of Sights (sales cycles)

1

3

2

2

3

 

 

6

8

 

(1)     Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis.

(2)     Orapa constitutes the Orapa Regime which includes Orapa, Letlhakane and Damtshaa.

(3)     Consolidated sales volumes exclude De Beers Group's JV partners' 50% proportionate share of sales to entities outside De Beers Group from the Diamond Trading Company Botswana and the Namibia Diamond Trading Company, which are included in total sales volume (100% basis).

(4)     Consolidated sales value includes De Beers Group's 50% proportionate share of sales to entities outside De Beers Group from Diamond Trading Company Botswana and the Namibia Diamond Trading Company.

(5)     Consolidated average realised price based on 100% selling value post-aggregation.

(6)     Average of the De Beers price index for the Sights within the period. The De Beers price index is relative to 100 as at December 2006. The previously reported quarterly figures have been amended from year to date to discreet quarter to date figures.

 

Steelmaking Coal

 

Steelmaking Coal(1) (000 t)

Q3

Q3

Q3 2024 vs. Q3 2023

Q2

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2023

2024

2024

2023

Steelmaking Coal

4,102

4,356

(6)%

4,238

(3)%

12,120

11,245

8%

(1)     Anglo American's attributable share of saleable production. Steelmaking coal production volumes may include some product sold as thermal coal and includes production relating to third-party product purchased and processed at Anglo American's operations.


Steelmaking coal production decreased by 6% to 4.1 million tonnes, primarily impacted by the cessation of mining at the Grosvenor underground longwall operation since the underground fire on 29 June 2024. Excluding the impact of Grosvenor, the rest of the portfolio has seen a 3% increase in production, with lower production at the Aquila longwall operation due to difficult strata conditions being more than offset by increased production at the Dawson open cut operation and the Moranbah longwall operation. 

During the quarter, the ratio of hard coking coal production to PCI/semi-soft coking coal was 74:26, in line with Q3 2023 (74:26).

Sales volumes were down 7% in line with lower production.

The year to date average realised price for hard coking coal was $253/tonne, compared to the benchmark price of $253/tonne. This reflects an increase in the price realisation to 100% (YTD 2023: 90%). This higher realisation is primarily as a result of the timing of sales during the year when prices were decreasing.

Significant progress has been made at Grosvenor, focusing on impact assessment and re-entry planning. Initial camera footage indicates the impact of the underground fire may have been relatively concentrated.

2024 Guidance

Production guidance for 2024 is unchanged at 14-15.5 million tonnes. A planned longwall move at Moranbah is taking place during Q4 2024. A walk-on/walk-off longwall move at Aquila, that will have a minimal production impact, started initial commissioning in late Q3 and will occur during mid-Q4 2024.

Unit cost guidance for 2024 is unchanged at c.$130-140/t(1).

(1)     2024 unit cost guidance was set at c.1.5 AUD:USD.


 

Coal, by product (000 t)(1)

Q3

Q2

Q1

Q4

Q3

Q3 2024 vs. Q3 2023

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2024

2024

2023

2023

2024

2023

Production volumes

 

 

 

 

 

 

 

 

 

 

Steelmaking Coal(2)(3)(4)

4,102

4,238

3,780

4,756

4,356

(6)%

(3)%

12,120

11,245

8%

Hard coking coal(2)

3,019

3,321

2,921

3,804

3,235

(7)%

(9)%

9,261

8,435

10%

PCI / SSCC

1,083

917

859

952

1,121

(3)%

18%

2,859

2,810

2%

Export thermal coal(4)

249

142

324

34

284

(12)%

75%

715

1,049

(32)%

Sales volumes

 

 

 

 

 

 

 

 

 

 

Steelmaking Coal(2)

3,921

4,105

3,827

3,795

4,226

(7)%

(4)%

11,853

11,145

6%

Hard coking coal(2)

3,027

3,212

2,974

2,987

3,199

(5)%

(6)%

9,213

8,579

7%

PCI / SSCC

894

893

853

808

1,027

(13)%

0%

2,640

2,566

3%

Export thermal coal

579

311

429

494

387

50%

86%

1,319

1,179

12%

 

Steelmaking coal, by operation (000 t)(1)

Q3

Q2

Q1

Q4

Q3

Q3 2024 vs. Q3 2023

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2024

2024

2023

2023

2024

2023

Steelmaking Coal(2)(3)(4)

4,102

4,238

3,780

4,756

4,356

(6)%

(3)%

12,120

11,245

8%

Moranbah(2)

1,117

923

561

662

946

18%

21%

2,601

2,470

5%

Grosvenor

191

1,215

967

1,021

560

(66)%

(84)%

2,373

1,776

34%

Aquila (incl. Capcoal)(2)

1,068

626

977

1,181

1,338

(20)%

71%

2,671

2,957

(10)%

Dawson(4)

928

647

487

1,118

688

35%

43%

2,062

1,784

16%

Jellinbah

798

827

788

774

824

(3)%

(4)%

2,413

2,258

7%

(1)     Anglo American's attributable share of saleable production.

(2)     Includes production relating to third-party product purchased and processed at Anglo American's operations.

(3)     Steelmaking coal production volumes may include some product sold as thermal coal.

(4)     Q4 2023 includes an adjustment for the 2023 year for some steelmaking coal produced at Dawson that had previously been reported as thermal coal.

 

Nickel

Nickel(1) (tonnes)

Q3

Q3

Q3 2024 vs. Q3 2023

Q2

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2023

2024

2024

2023

Nickel

9,900

9,300

6%

10,000

(1)%

29,400

28,900

2%

(1)     Excludes nickel production from the Platinum Group Metals business.

 

Production increased by 6% to 9,900 tonnes, due to operational improvements and higher stability at the Barro Alto plant as well as longer planned maintenance in the comparative period. This performance was partially offset by lower production from Codemin, which was impacted by an unplanned stoppage at the refinery during the quarter.

2024 Guidance

Production guidance for 2024 has been revised up to 38,000-39,000 tonnes (previously 36,000-38,000 tonnes), reflecting strong operational performance.

Unit cost guidance for 2024 has been revised down to c.530 c/lb(1) (previously c.550 c/lb), due to higher production volumes.

(1)     2024 unit cost guidance was set at c.5.0 BRL:USD.

 

 

Nickel (tonnes)

Q3

Q2

Q1

Q4

Q3

Q3 2024 vs. Q3 2023

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2024

2024

2023

2023

2024

2023

Barro Alto

 

 

 

 

 

 

 

 

 

 

Ore mined

1,166,800

1,275,400

319,200

1,094,700

1,387,900

(16)%

(9)%

2,761,400

3,206,100

(14)%

Ore processed

617,700

616,800

636,500

634,000

559,800

10%

0%

1,871,000

1,842,400

2%

Ore grade processed - %Ni

1.50

1.51

1.42

1.48

1.48

1%

(1)%

1.48

1.43

3%

Production

8,200

8,200

7,800

8,800

7,200

14%

0%

24,200

23,000

5%

Codemin

 

 

 

 

 

 

 

 

 

 

Ore mined

-

-

-

-

-

n/a

n/a

-

27,800

n/a

Ore processed

140,800

139,700

136,300

152,500

153,200

(8)%

1%

416,800

447,000

(7)%

Ore grade processed - %Ni

1.42

1.45

1.43

1.46

1.44

(1)%

(2)%

1.43

1.40

2%

Production

1,700

1,800

1,700

2,300

2,100

(19)%

(6)%

5,200

5,900

(12)%

Total nickel production(1)

9,900

10,000

9,500

11,100

9,300

6%

(1)%

29,400

28,900

2%

Sales volumes

9,200

11,300

7,700

11,400

9,300

(1)%

(19)%

28,200

28,400

(1)%

(1)     Excludes nickel production from the Platinum Group Metals business.

Manganese

Manganese (000 t)

Q3

Q3

Q3 2024 vs. Q3 2023

Q2

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2023

2024

2024

2023

Manganese ore(1)

406

1,012

(60)%

356

14%

1,545

2,823

(45)%

(1)     Anglo American's 40% attributable share of saleable production.

Manganese ore production decreased by 60% to 405,500 tonnes, primarily due to the ongoing temporary suspension of the Australian operations due to the impact of tropical cyclone Megan in March 2024. The weather event caused widespread flooding and significant damage to critical infrastructure. Operational recovery focused on re-establishing critical services and undertaking a substantial dewatering program which enabled a phased return to mining activities in June 2024. Investment in crucial infrastructure, which included a critical bridge connecting the northern mining pits and the primary concentrator, as well as the wharf infrastructure, continued in September 2024.

 

Manganese (tonnes)

Q3

Q2

Q1

Q4

Q3

Q3 2024 vs. Q3 2023

Q3 2024 vs. Q2 2024

YTD

YTD

YTD 2024 vs. YTD 2023

2024

2024

2024

2023

2023

2024

2023

Samancor production

 

 

 

 

 

 

 

 

 

 

Manganese ore(1)

405,500

356,000

783,800

847,800

1,012,100

(60)%

14%

1,545,300

2,822,800

(45)%

Samancor sales volumes

 

 

 

 

 

 

 

 

 

 

Manganese ore

393,500

365,800

796,800

992,000

971,500

(59)%

8%

1,556,100

2,733,000

(43)%

(1)     Anglo American's 40% attributable share of saleable production.

Exploration and evaluation

Exploration and evaluation expenditure in Q3 2024 decreased by 21% to $71 million compared to the same period last year. Exploration expenditure decreased by 24% to $29 million primarily due to a decrease in spend in iron ore and diamonds. Evaluation expenditure decreased by 19% to $42 million, mainly due to a decrease in spend in PGMs, steelmaking coal and diamonds.

 

Notes

• This Production Report for the third quarter ended 30 September 2024 is unaudited.

• Production figures are sometimes more precise than the rounded numbers shown in this Production Report.

• Copper equivalent production shows changes in underlying production volume, and includes the equity share of De Beers' production. It is calculated by expressing each product's volume as revenue, subsequently converting the revenue into copper equivalent units by dividing by the copper price (per tonne). Long-term forecast prices are used, in order that period-on-period comparisons exclude any impact for movements in price.

• Please refer to page 17 for information on forward-looking statements.


In this document, references to "Anglo American", the "Anglo American Group", the "Group", "we", "us", and "our" are to refer to either Anglo American plc and its subsidiaries and/or those who work for them generally, or where it is not necessary to refer to a particular entity, entities or persons. The use of those generic terms herein is for convenience only, and is in no way indicative of how the Anglo American Group or any entity within it is structured, managed or controlled. Anglo American subsidiaries, and their management, are responsible for their own day-to-day operations, including but not limited to securing and maintaining all relevant licences and permits, operational adaptation and implementation of Group policies, management, training and any applicable local grievance mechanisms. Anglo American produces Group-wide policies and procedures to ensure best uniform practices and standardisation across the Anglo American Group but is not responsible for the day to day implementation of such policies. Such policies and procedures constitute prescribed minimum standards only. Group operating subsidiaries are responsible for adapting those policies and procedures to reflect local conditions where appropriate, and for implementation, oversight and monitoring within their specific businesses.

This document is for information purposes only and does not constitute, nor is to be construed as, an offer to sell or the recommendation, solicitation, inducement or offer to buy, subscribe for or sell shares in Anglo American or any other securities by Anglo American or any other party. Further, it should not be treated as giving investment, legal, accounting, regulatory, taxation or other advice and has no regard to the specific investment or other objectives, financial situation or particular needs of any recipient.

 

For further information, please contact:

Media

Investors

UK

James Wyatt-Tilby

james.wyatt-tilby@angloamerican.com

Tel: +44 (0)20 7968 8759

 

Marcelo Esquivel

marcelo.esquivel@angloamerican.com

Tel: +44 (0)20 7968 8891

 

Rebecca Meeson-Frizelle

rebecca.meeson-frizelle@angloamerican.com

Tel: +44 (0)20 7968 1374

 

South Africa

Nevashnee Naicker

nevashnee.naicker@angloamerican.com

Tel: +27 (0)11 638 3189

 

UK

Tyler Broda

tyler.broda@angloamerican.com

Tel: +44 (0)20 7968 1470

 

Michelle West-Russell

michelle.west-russell@angloamerican.com

Tel: +44 (0)20 7968 1494

 

Asanda Malimba

asanda.malimba@angloamerican.com

Tel: +44 (0)20 7968 8480

Notes:

Anglo American is a leading global mining company focused on the responsible production of copper, premium iron ore and crop nutrients - future-enabling products that are essential for decarbonising the global economy, improving living standards, and food security. Our portfolio of world-class operations and outstanding resource endowments offers value-accretive growth potential across all three businesses, positioning us to deliver into structurally attractive major demand growth trends.

Our integrated approach to sustainability and innovation drives our decision-making across the value chain, from how we discover new resources to how we mine, process, move and market our products to our customers - safely, efficiently and responsibly. Our Sustainable Mining Plan commits us to a series of stretching goals over different time horizons to ensure we contribute to a healthy environment, create thriving communities and build trust as a corporate leader. We work together with our business partners and diverse stakeholders to unlock enduring value from precious natural resources for our shareholders, for the benefit of the communities and countries in which we operate, and for society as a whole. Anglo American is re-imagining mining to improve people's lives.

Anglo American is currently implementing a number of major structural changes to unlock the inherent value in its portfolio and thereby accelerate delivery of its strategic priorities of Operational excellence, Portfolio simplification, and Growth. This portfolio transformation will focus Anglo American on its world-class resource asset base in copper, premium iron ore and crop nutrients, once the sale of our steelmaking coal and nickel businesses, the demerger of our PGMs business (Anglo American Platinum), and the separation of our iconic diamond business (De Beers) have been completed.

www.angloamerican.com

 

 

 

 


Forward-looking statements and third-party information:

This announcement includes forward-looking statements. All statements other than statements of historical facts included in this document, including, without limitation, those regarding Anglo American's financial position, business, acquisition and divestment strategy, dividend policy, plans and objectives of management for future operations, prospects and projects (including development plans and objectives relating to Anglo American's products, production forecasts and Ore Reserve and Mineral Resource positions) and sustainability performance related (including environmental, social and governance) goals, ambitions, targets, visions, milestones and aspirations, are forward-looking statements. By their nature, such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Anglo American or industry results to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.

Such forward-looking statements are based on numerous assumptions regarding Anglo American's present and future business strategies and the environment in which Anglo American will operate in the future. Important factors that could cause Anglo American's actual results, performance or achievements to differ materially from those in the forward-looking statements include, among others, levels of actual production during any period, levels of global demand and product prices, unanticipated downturns in business relationships with customers or their purchases from Anglo American, mineral resource exploration and project development capabilities and delivery, recovery rates and other operational capabilities, safety, health or environmental incidents, the effects of global pandemics and outbreaks of infectious diseases, the impact of attacks from third parties on our information systems, natural catastrophes or adverse geological conditions, climate change and extreme weather events, the outcome of litigation or regulatory proceedings, the availability of mining and processing equipment, the ability to obtain key inputs in a timely manner, the ability to produce and transport products profitably, the availability of necessary infrastructure (including transportation) services, the development, efficacy and adoption of new or competing technology, challenges in realising resource estimates or discovering new economic mineralisation, the impact of foreign currency exchange rates on market prices and operating costs, the availability of sufficient credit, liquidity and counterparty risks, the effects of inflation, terrorism, war, conflict, political or civil unrest, uncertainty, tensions and disputes and economic and financial conditions around the world, evolving societal and stakeholder requirements and expectations, shortages of skilled employees, unexpected difficulties relating to acquisitions or divestitures, competitive pressures and the actions of competitors, activities by courts, regulators and governmental authorities such as in relation to permitting or forcing closure of mines and ceasing of operations or maintenance of Anglo American's assets and changes in taxation or safety, health, environmental or other types of regulation in the countries where Anglo American operates, conflicts over land and resource ownership rights and such other risk factors identified in Anglo American's most recent Annual Report. Forward-looking statements should, therefore, be construed in light of such risk factors and undue reliance should not be placed on forward-looking statements.

These forward-looking statements speak only as of the date of this document. Anglo American expressly disclaims any obligation or undertaking (except as required by applicable law, the City Code on Takeovers and Mergers, the UK Listing Rules, the Disclosure Guidance and Transparency Rules of the Financial Conduct Authority, the Listings Requirements of the securities exchange of the JSE Limited in South Africa, the SIX Swiss Exchange, the Botswana Stock Exchange and the Namibian Stock Exchange and any other applicable regulations) to release publicly any updates or revisions to any forward-looking statement contained herein to reflect any change in Anglo American's expectations with regard thereto or any change in events, conditions or circumstances on which any such statement is based.

Nothing in this document should be interpreted to mean that future earnings per share of Anglo American will necessarily match or exceed its historical published earnings per share. Certain statistical and other information included in this document is sourced from third-party sources (including, but not limited to, externally conducted studies and trials). As such it has not been independently verified and presents the views of those third parties, but may not necessarily correspond to the views held by Anglo American and Anglo American expressly disclaims any responsibility for, or liability in respect of, such information.

©Anglo American Services (UK) Ltd 2024.  TM and  TM are trade marks of Anglo American Services (UK) Ltd.

Legal Entity Identifier: 549300S9XF92D1X8ME43

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 