5 November 2024
Oracle Power PLC
("Oracle" or the "Company")
Completion of Transmission & Grid Interconnection Study for Proposed Renewable Power Plant
Oracle Power PLC (AIM:ORCP), an international project developer, together with its joint venture company, Oracle Energy Limited ("Oracle Energy"), a developer of green energy projects, is pleased to announce completion of the Transmission & Grid Interconnection Study (the "Study") in respect of its proposed 1.3GW hybrid renewable energy power plant in Jhimpir, Sindh Province,
The Study, entirely funded by State Grid China, assessed the technical feasibility of interconnecting the proposed 1.3GW Hybrid Renewable Energy Power Plant (the "Hybrid RE PP"), which consists of 800MW solar power, 500MW wind power generation and a suitable battery energy storage system, to provide renewable power to the National Grid. Based on the updated transmission plan and load forecast provided by the National Transmission and Dispatch Company ("NTDC"), the Study proposes interconnecting the plant to the 220kV Jhimpir-II Grid Station via a direct 220kV double circuit transmission line of 35km in length, using a quad bundle rail conductor. The Study outlines the generation voltage for the Hybrid RE PP, which will be increased to 33kV using transformers at each inverter and collector group. The net maximum output of the plant is expected to be 1,155MW. Additionally, a 260MW battery energy storage system (BESS) is proposed to enhance system reliability, and a static var compensator (SVC) will be installed to maintain the required power factor, thereby fulfilling NTDC Grid Code requirements.
Comprehensive load flow studies were performed for peak and off-peak conditions during both summer and winter periods, demonstrating the reliability of the proposed transmission scheme under normal and contingency (N-1) conditions. Short circuit and dynamic stability analyses confirmed that fault currents are within rated capacities, and the system successfully passed dynamic stability checks, ensuring resilience under fault conditions.
The completed Study has now been submitted to NTDC for review and approval by the Pakistan Government. This approval process will be critical in advancing the project towards implementation and the Company looks forward to providing further updates in due course.
Oracle's CEO, Naheed Memon, commented: "We are pleased to confirm the completion of this key Study for our proposed hybrid renewable energy power plant in Jhimpir. This milestone marks the culmination of extensive investigative studies and sets the stage for the next phase of detailed engineering design (FEED). The findings of the Study provide a solid foundation for securing potential off-take agreements for power. Our strategic focus remains on ultimately seamlessly integrating renewable energy into the National Grid, thereby enhancing energy security and promoting sustainable development in
-ENDS-
For further information contact:
Oracle Power PLC Naheed Memon - CEO
|
+44 (0) 20 7236 1177 |
Strand Hanson Limited (Nominated Adviser & Broker) Rory Murphy, Matthew Chandler, Rob Patrick
|
+44 (0) 20 7409 3494 |
St Brides Partners Limited (Financial PR) Isabel de Salis, Susie Geliher |
oracle@stbridespartners.co.uk |
About PPI
Power Planners International (Pvt.) Ltd is registered with the Pakistan Engineering Council and accredited with registrations in
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.